[1]. Erik B. N. and Guillot B., Well Cementing”, Second edition, Schlumberger Educational Services, Texas 1990.
[2]. Tinsley J. M., Miller E. C., Sabins F. L., and Sutton D. L.: “Study of factors causing annular gas flow following primary cementing,” pp. SPE. 8257, 1979.
[3]. Bannister C. E. et al., “Critical design parameters to prevent gas invasion during cementing operations”, pp. SPE. 11982, 1983.
[4]. گزارشات حفاری، پیشبینی و تکمیل برخی از چاههای منطقه.
[5]. Webster W. W. and Eikerts J. V., “Flow after cementing – field and laboratory study,” pp. SPE 8259, 1979.
[6]. Watters L. T. and Sabins F. L.: “Field evaluation of method to control gas flow following cementing,” pp. SPE. 9287, 1980.
[7]. Sutton D. L. and Faul R.: “Annular gas flow theory and prevention methods described,” Oil & Gas J., pp. 84-112, 1984.
[8]. Sabins F. L., Tinsley J. M., and Sutton D. L.: “Transition time of cement slurries between the fluid and set states”, Society of Petroleum Engineers Journal, Vol. 22 (6), pp. 875-882, 1982.
[9]. Rae P., Wilkins D., and Free D., “A new approach for predicting gas flow after cementing,” pp. SPE/IADC 18622, 1989.
[10]. Al-Yami A. S., Nasr-El-Din H. A. and Ahmad Al-Humaidi, “An innovative cement formula to prevent gas-migration problems in HT/HP wells,” pp. SPE 120885-MS, 2009.
[11]. Drecq P. and Parcevaux P. A.: “A single technique solves gas migration problem across a wide range of conditions,” pp. SPE. 17629, 1988.
[12]. Stewart R. B. and Schouten F. C., “Gas invasion and migration cemented annuli: Causes and Cures,” pp. JADC/SPE. 14779, 1986.
[13]. Christian W. W., Chatterji J., and Ostoot G. W., “Gas leakage in primary cementing a field study and laboratory investigation,” pp. SPE. 5517, 1975.
[14]. Cheung P. R. and Beirute R. M.: “Gas flow in cements,” pp. SPE. 11207, 1982.
[15]. Sykes R. L. and Logan J. L., “New technology in gas migration control”, pp. SPE. 6653, 1987.
[16]. Sutton D. L., Sabins F. L., and Paul R., “New evaluation for annular gas-flow potential”, Oil & Gas J., pp. 109-112, 1984.
[17]. Sepos D. J. and Cart B. W., “New quick detting cement solves shallow gas migration problems and reduces WOC time,” pp. SPE. 14500, 1985.
[18]. Gonzalo V., Aiskely B. and Alicia C., “A methodology to evaluate the gas migration in cement slurries,” pp. SPE 94901-MS, 2005.
[19]. Haijin Z., Jiansheng Q. , Aiping L., Jianlong Z.,and Jiaxing X., “A new method to evaluate the gas migration for cement slurries,” pp. SPE. 131052-MS, 2010.
[20]. Mohammadi Pour M. , and Moghadasi J., “New cement formulation that solves gas migration problems in iranian south pars field condition” pp. SPE. 105663-MS, 2007.
[21]. Cheung P. R. and Myrick B. D., “Field evaluation of an impermeable cement system for controlling gas migration,” pp. SPE. 11983, 1983.
[22]. Cooke C. and Cunningham W. C., “Filtrate control a key in successful cementing practices,” JPT, pp. 951-956, 1977.
[23]. Williams D., Cheung R., Norman M., and Woodroof R., Jr., “Annular gas migration can be controlled,” Oil & Gas J., pp. 146-151, 1983.
[24]. Scott S., Jennings Adel A. Al-Ansari, Abdullah S. Al-Yami, “Gas migration after cementing greatly reduced”, pp. SPE. 81414-MS, 2003.
[25]. Bearden W. G. et al., “Control and prevention of inter-zonal flow”, pp. SPE. 903, 1964.
[26]. Carter L. G. and Evans G. W., “A study of cement – pipe bonding,” pp. SPE. 764, 1964.